South Korea · Power project

154kV 대저-어방 전력구 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 대저-어방 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-cf05ac171ff554e3adab502b
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_e09d0ab3f4412cd5
stable_project_keyprjtDef:234443:ESB
project_definition234443
first_region_codeESB
manual_source_formatfalse
project_name154kV 대저-어방 전력구 건설사업
project_name_list김해-강서지역 전기공급시설 전력구공사(대저-어방 1차)
purpose부산 강서구 및 경남 김해지역 계통보강
project_region_detail경상남도 김해시 부산광역시 강서구
project_period_raw2019.04~2029.07
project_scale_raw터널3,675M, 압입249M, 관로4,258M, 전력구10M
responsible_office_raw남부건설본부/직할
equipment_type전력구
headquarters남부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_105ccad9287a643d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_e09d0ab3f4412cd5

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_e09d0ab3f4412cd5

Sources EV-cf05ac171ff554e3adab502b
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 0a5abdca21c60e85f062b1a05f4a733c5eab868b0a3f84bb36e838633b7fe2e3

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel