South Korea · Power project

154kV 남공주S/S 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 남공주S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-1210c0744cd35631853be47c
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_d6b08b9a5dc76977
stable_project_keyprjtDef:231334:ESB
project_definition231334
first_region_codeESB
manual_source_formatfalse
project_name154kV 남공주S/S 건설사업
project_name_list154kV 남공주S/S 건설사
purpose남공주산업단지 부하공급 및 인근변전소 부하분담
project_region_detail충청남도 공주시
project_period_raw2014.02~2025.10
project_scale_raw45/60MVA X 2BANK
responsible_office_raw중부건설본부/직할
equipment_type변전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_7c5fb5c4cae6154a
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_d6b08b9a5dc76977

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_d6b08b9a5dc76977

Sources EV-1210c0744cd35631853be47c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 3f9463854a14a5eb5c1e76493649dfdc6b842f7f92c581be69aa25f1fde8ed42

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel