South Korea · Power project

154kV 동세종분기 지중T/L 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 동세종분기 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-efcd47b41909e679aa98388c
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_bd11d87e96da6874
stable_project_keyprjtDef:233649:ESB
project_definition233649
first_region_codeESB
manual_source_formatfalse
project_name154kV 동세종분기 지중T/L 건설사업
project_name_list154kV 동세종분기 지중T/L 건설사업
purpose세종특별자치시 개발에 따른 신규부하 공급
project_region_detailSejong Special Self-Governing City
project_period_raw2025.01~2027.06
project_scale_raw154㎸ XLPE 2,000/2,500㎟ (동세종-월산2.7KM / 세종-동세종2.4KM)
responsible_office_raw중부건설본부/직할
equipment_type지중송전
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6ff73bc970f7f2f9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_bd11d87e96da6874

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_bd11d87e96da6874

Sources EV-efcd47b41909e679aa98388c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b35e6a7e120b5ef0987cb70a4f470bea1cdf2213e0524c3c23b52fd4e8cb5bdd

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel