POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 11items · current page 1–11 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 동세종분기 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-efcd47b41909e679aa98388c
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_bd11d87e96da6874
stable_project_keyprjtDef:233649:ESB
project_definition233649
first_region_codeESB
manual_source_formatfalse
project_name154kV 동세종분기 지중T/L 건설사업
project_name_list154kV 동세종분기 지중T/L 건설사업
purpose세종특별자치시 개발에 따른 신규부하 공급
project_region_detailSejong Special Self-Governing City
project_period_raw2025.01~2027.06
project_scale_raw154㎸ XLPE 2,000/2,500㎟ (동세종-월산2.7KM / 세종-동세종2.4KM)
responsible_office_raw중부건설본부/직할
equipment_type지중송전
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6ff73bc970f7f2f9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_bd11d87e96da6874

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_bd11d87e96da6874

Sources EV-efcd47b41909e679aa98388c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b35e6a7e120b5ef0987cb70a4f470bea1cdf2213e0524c3c23b52fd4e8cb5bdd
Source schedule candidates · KOR · kepco_planned

154kV 동세종분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2024-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233649|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6ff73bc970f7f2f9

Sources EV-be25d2d2d3fadb0d70ae1098
Evidence SHA-256 59ba39ddbd689be996877f8a9cdba66c89b860a86e8124e7a83b80470bff7040
행 SHA-256 ae9c59e7ccedf524a51b76b96c8d1ff4b395ce6ddb2e5dd565e855809c4a9d0b
Source schedule candidates · KOR · kepco_planned

154kV 동세종분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233649|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6ff73bc970f7f2f9

Sources EV-be25d2d2d3fadb0d70ae1098
Evidence SHA-256 59ba39ddbd689be996877f8a9cdba66c89b860a86e8124e7a83b80470bff7040
행 SHA-256 ae9c59e7ccedf524a51b76b96c8d1ff4b395ce6ddb2e5dd565e855809c4a9d0b
Source schedule candidates · KOR · kepco_planned

154kV 동세종분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233649|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6ff73bc970f7f2f9

Sources EV-be25d2d2d3fadb0d70ae1098
Evidence SHA-256 59ba39ddbd689be996877f8a9cdba66c89b860a86e8124e7a83b80470bff7040
행 SHA-256 ae9c59e7ccedf524a51b76b96c8d1ff4b395ce6ddb2e5dd565e855809c4a9d0b
Source schedule candidates · KOR · kepco_planned

154kV 동세종분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233649|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6ff73bc970f7f2f9

Sources EV-be25d2d2d3fadb0d70ae1098
Evidence SHA-256 59ba39ddbd689be996877f8a9cdba66c89b860a86e8124e7a83b80470bff7040
행 SHA-256 ae9c59e7ccedf524a51b76b96c8d1ff4b395ce6ddb2e5dd565e855809c4a9d0b
Source schedule candidates · KOR · kepco_planned

154kV 동세종분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2026-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233649|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6ff73bc970f7f2f9

Sources EV-be25d2d2d3fadb0d70ae1098
Evidence SHA-256 59ba39ddbd689be996877f8a9cdba66c89b860a86e8124e7a83b80470bff7040
행 SHA-256 ae9c59e7ccedf524a51b76b96c8d1ff4b395ce6ddb2e5dd565e855809c4a9d0b
Source schedule candidates · KOR · kepco_planned

154kV 동세종분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233649|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6ff73bc970f7f2f9

Sources EV-be25d2d2d3fadb0d70ae1098
Evidence SHA-256 59ba39ddbd689be996877f8a9cdba66c89b860a86e8124e7a83b80470bff7040
행 SHA-256 ae9c59e7ccedf524a51b76b96c8d1ff4b395ce6ddb2e5dd565e855809c4a9d0b
Source schedule candidates · KOR · kepco_planned

154kV 동세종분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2027-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233649|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6ff73bc970f7f2f9

Sources EV-be25d2d2d3fadb0d70ae1098
Evidence SHA-256 59ba39ddbd689be996877f8a9cdba66c89b860a86e8124e7a83b80470bff7040
행 SHA-256 ae9c59e7ccedf524a51b76b96c8d1ff4b395ce6ddb2e5dd565e855809c4a9d0b
Source schedule candidates · KOR · kepco_planned

154kV 동세종분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233649|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6ff73bc970f7f2f9

Sources EV-be25d2d2d3fadb0d70ae1098
Evidence SHA-256 59ba39ddbd689be996877f8a9cdba66c89b860a86e8124e7a83b80470bff7040
행 SHA-256 ae9c59e7ccedf524a51b76b96c8d1ff4b395ce6ddb2e5dd565e855809c4a9d0b
Source snapshots by date · KOR · kepco_planned

154kV 동세종분기 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_6ff73bc970f7f2f9
stable_project_idkproj_bd11d87e96da6874
source_key202609|233649|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 동세종분기 지중T/L 건설사업
project_name_detail154kV 동세종분기 지중T/L 건설사업
region_summary_raw세종특별자치시등 1 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 세종특별자치시 개발에 따른 신규부하 공급
Project region
  • Sejong Special Self-Governing City
Project period
  • 2025.01~2027.06
사업 규모
  • 154㎸ XLPE 2,000/2,500㎟ (동세종-월산2.7KM / 세종-동세종2.4KM)
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
[진행경과] □ '21.07 : 제9차 장기 송변전설비계획 신규사업 반영 □ '24.08 : 기본설계 완료 □ '25.04 : 실시설계 요청 □ '25.12 : 주자재 발주 [향후계획] □ '26.05 : 실시설계 완료 □ '26.07 : 착공
future_plan_redacted□ 향후계획 [진행경과] □ '21.07 : 제9차 장기 송변전설비계획 신규사업 반영 □ '24.08 : 기본설계 완료 □ '25.04 : 실시설계 요청 □ '25.12 : 주자재 발주 [향후계획] □ '26.05 : 실시설계 완료 □ '26.07 : 착공
attachment_count0
source_detail_sha25659ba39ddbd689be996877f8a9cdba66c89b860a86e8124e7a83b80470bff7040
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233649|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_6ff73bc970f7f2f9

Sources EV-be25d2d2d3fadb0d70ae1098
Evidence SHA-256 59ba39ddbd689be996877f8a9cdba66c89b860a86e8124e7a83b80470bff7040
행 SHA-256 ae9c59e7ccedf524a51b76b96c8d1ff4b395ce6ddb2e5dd565e855809c4a9d0b
Source snapshots by date · KOR · kepco_planned

154kV 동세종분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_bd11d87e96da6874
stable_project_keyprjtDef:233649:ESB
project_definition233649
first_region_codeESB
manual_source_formatfalse
project_name154kV 동세종분기 지중T/L 건설사업
project_name_list154kV 동세종분기 지중T/L 건설사업
purpose세종특별자치시 개발에 따른 신규부하 공급
project_region_detailSejong Special Self-Governing City
project_period_raw2025.01~2027.06
project_scale_raw154㎸ XLPE 2,000/2,500㎟ (동세종-월산2.7KM / 세종-동세종2.4KM)
responsible_office_raw중부건설본부/직할
equipment_type지중송전
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6ff73bc970f7f2f9
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_bd11d87e96da6874

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_bd11d87e96da6874

Sources EV-efcd47b41909e679aa98388c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b35e6a7e120b5ef0987cb70a4f470bea1cdf2213e0524c3c23b52fd4e8cb5bdd

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel