South Korea · Power project

154kV 남공주분기T/L 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 남공주분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-9483ee93159e655eeed09ba6
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_b2888cb5aea4e25c
stable_project_keyprjtDef:232369:ESB
project_definition232369
first_region_codeESB
manual_source_formatfalse
project_name154kV 남공주분기T/L 건설사업
project_name_list154kV 남공주분기 송전선로 건설사업
purpose남공주 일반산업단지 신규부하 공급
project_region_detail충청남도 공주시
project_period_raw2019.10~2025.10
project_scale_rawACSR 410㎟×2B×4C×8.727M
responsible_office_raw중부건설본부/직할
equipment_type가공송전
headquarters중부건설본부
office직할
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_265f1ab419027ae4
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_b2888cb5aea4e25c

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_b2888cb5aea4e25c

Sources EV-9483ee93159e655eeed09ba6
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b10027ade06d13c73f63a1baf045a2cd9e674da447b6b5f633dafaa6f797cd9a

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel