154kV 남공주분기T/L 건설사업
電力事業 · 工事事業
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| project_name_voltage_label | 154 kV | literal project name label not service voltage · project name · 工事事業 基準日 2026-09 根拠 EV-9483ee93159e655eeed09ba6 |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| stable_project_id | kproj_b2888cb5aea4e25c |
| stable_project_key | prjtDef:232369:ESB |
| project_definition | 232369 |
| first_region_code | ESB |
| manual_source_format | false |
| project_name | 154kV 남공주분기T/L 건설사업 |
| project_name_list | 154kV 남공주분기 송전선로 건설사업 |
| purpose | 남공주 일반산업단지 신규부하 공급 |
| project_region_detail | 충청남도 공주시 |
| project_period_raw | 2019.10~2025.10 |
| project_scale_raw | ACSR 410㎟×2B×4C×8.727M |
| responsible_office_raw | 중부건설본부/직할 |
| equipment_type | 가공송전 |
| headquarters | 중부건설본부 |
| office | 직할 |
| current_stage_raw | 공사착수-사업완료전 |
| snapshot_count | 1 |
| active_snapshot_count | 1 |
| snapshot_ids |
|
| first_seen_at | 2026-10-02 |
| last_confirmed_at | 2026-10-02T01:55:13Z |
| location_precision | region_only |
| geometry_semantics | no_verified_geometry |
| geometry | 未取得 |
| source_list_url | https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do |
| source_detail_url | https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do |
| 原文の状態 | 공사착수-사업완료전 |
| source_record_id | stable_project_id:kproj_b2888cb5aea4e25c |
位置: 座標未取得・地図表示なし
原文・基準日・確認日 1件
資料の基準 2026-09 ・取得確認 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
原文内の位置 stable_project_id:kproj_b2888cb5aea4e25c
根拠 EV-9483ee93159e655eeed09ba6資料SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 b10027ade06d13c73f63a1baf045a2cd9e674da447b6b5f633dafaa6f797cd9a
