South Korea · Power project

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
Not stated
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date Not stated
Sources EV-75497b997b2103e61680a1d0
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_adbcd7cda9c92aed
stable_project_keymanual:7:0:-
project_definition0
first_region_code
manual_source_formattrue
project_name154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업
project_name_list154kV 광주이천(가칭) 변전소 및 관련분기 송전선로 건설사업
purpose
project_region_detail경기도 광주시,이천시
project_period_raw2023.05~
project_scale_raw
responsible_office_raw경인건설본부/경기건설지사
equipment_type변전
headquarters경인건설본부
office경기건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d2bddb5cdf769843
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_adbcd7cda9c92aed

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source Not stated · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_adbcd7cda9c92aed

Sources EV-75497b997b2103e61680a1d0
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4c462e8a3aa2978cd289f9ba4cf7a563ae58129f975ad0893cd8ccaad30d9177

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel