South Korea · Power project

154kV 계림-일곡 2차 전력구 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 계림-일곡 2차 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-e5159f9985d0f09f553adcf1
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_8913f7ca8072b281
stable_project_keyprjtDef:234585:ESB
project_definition234585
first_region_codeESB
manual_source_formatfalse
project_name154kV 계림-일곡 2차 전력구 건설사업
project_name_list광주지역 전기공급시설 전력구공사(계림-일곡2차)
purpose계림S/S-일곡S/S 계통보강
project_region_detail전남광주통합특별시 북구
project_period_raw2019.10~2024.12
project_scale_raw관로 1,464M, 메사쉴드 59M, 세미쉴드 119M
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type전력구
headquarters중부건설본부
office광주전남건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_7d0fb75611b6f544
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_8913f7ca8072b281

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_8913f7ca8072b281

Sources EV-e5159f9985d0f09f553adcf1
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 523e1b06946f8d613b2d3caa377f21a8e56afacdb24065a6ef26b848d3278b4f

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel