South Korea · Power project

154kV 동평택-북평택 지중T/L 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-cc78862c36846f0ce486ad2d
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_85762af576a613ba
stable_project_keyprjtDef:233331:ESB
project_definition233331
first_region_codeESB
manual_source_formatfalse
project_name154kV 동평택-북평택 지중T/L 건설사업
project_name_list154kV 동평택-북평택 지중송전선로 건설사업
purpose154KV 북평택S/S 단일계통 해소
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2025.12~2026.10
project_scale_raw154KV XLPE 2,000㎟, 2C×3.4KM
responsible_office_raw경인건설본부/경기건설지사
equipment_type지중송전
headquarters경인건설본부
office경기건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b6f4863530e8e723
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_85762af576a613ba

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_85762af576a613ba

Sources EV-cc78862c36846f0ce486ad2d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 24a040998926a2131119c9b4aa0f8565b66a103ae1ecbee3aa75140a92a80682

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel