POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 23items · current page 1–23 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-cc78862c36846f0ce486ad2d
Detailed source fields Original source field Published value or condition stable_project_id kproj_85762af576a613ba stable_project_key prjtDef:233331:ESB project_definition 233331 first_region_code ESB manual_source_format false project_name 154kV 동평택-북평택 지중T/L 건설사업 project_name_list 154kV 동평택-북평택 지중송전선로 건설사업 purpose 154KV 북평택S/S 단일계통 해소 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2025.12~2026.10 project_scale_raw 154KV XLPE 2,000㎟, 2C×3.4KM responsible_office_raw 경인건설본부/경기건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_85762af576a613ba
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_85762af576a613ba
Sources EV-cc78862c36846f0ce486ad2d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 24a040998926a2131119c9b4aa0f8565b66a103ae1ecbee3aa75140a92a80682 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2025-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2026-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-06 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2025-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2025-07 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2025-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-04-06 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|233331|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_b6f4863530e8e723 stable_project_id kproj_85762af576a613ba source_key 202609|233331|ESB basic_ym 202609 source_stage_raw 사업승인-공사착수전 project_name_list 154kV 동평택-북평택 지중송전선로 건설사업 project_name_detail 154kV 동평택-북평택 지중T/L 건설사업 region_summary_raw 경기도 평택시등 1 지역 equipment_type_raw 지중송전 headquarters_raw 경인건설본부 office_raw 경기건설지사 section_fields Project region Pyeongtaek, Gyeonggi Province 사업 규모 154KV XLPE 2,000㎟, 2C×3.4KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 1. 사업명 : 154kV 동평택-북평택 지중송전선로 건설사업 2. 사업개요 □ 사업목적 : 154kV 북평택변전소 단일계통 해소 □ 사업지역 - 경기 평택시 고덕동 2524(동평택 변전소) ~ 경기 평택시 고덕동 2278-2(북평택 변전소) □ 사업기간 : 2025.12 ~ 2027.03 □ 사업규모 : 154KV XLPE 2,000㎟, 2C×3.4KM □ 담당사업소 : 경인건설본부 경기건설지사 □ 담당자: [redacted], 2025.09] □ 도급공사 착공[(주)태유전력, 2025.12] □ 용역공사 착공[(주)건축사사무소 테크뱅크, 2026.03] □ 공사 진행 중(포설10/12, 접속 8/14) 中 사업설계 설계용역: 2025.04 ~ 2025.07 기본설계: 2025.02 ~ 2025.04 실시설계: 2025.04 ~ 2025.07 설계담당자: [redacted] ○ '25.07 : 실시설계 완료 ○ `25.04 기본설계완료 ○ `25.04 토목공법변경(추진관압입→지향성압입) ○ `25.07 실시설계 완료 ○ `25.09 주자재 계약완료[일진전기(주)] ○ `25.09 토목 맨홀 위치 변경 ○ `25.12 공사 계약완료[(주)태유전력] 및 공사중지 ○ `26.03 감리용역 계약[(주)건축사사무소 테크뱅크] 및 공사신고 ○ `26.04 전기사업용 전기설비 공사계획 신고 수리[에너지관리과-10731(’26.04.06)] ○ `26.04 착공전 청렴·품질·안전 회의 시행(4/15) 및 실착공(4/20) ○ `26.06 케이블 포설 및 케이블 접속 中 future_plan_redacted □ 향후계획 ○ '25.07 : 실시설계 완료 ○ `25.04 기본설계완료 ○ `25.04 토목공법변경(추진관압입→지향성압입) ○ `25.07 실시설계 완료 ○ `25.09 주자재 계약완료[일진전기(주)] ○ `25.09 토목 맨홀 위치 변경 ○ `25.12 공사 계약완료[(주)태유전력] 및 공사중지 ○ `26.03 감리용역 계약[(주)건축사사무소 테크뱅크] 및 공사신고 ○ `26.04 전기사업용 전기설비 공사계획 신고 수리[에너지관리과-10731(’26.04.06)] ○ `26.04 착공전 청렴·품질·안전 회의 시행(4/15) 및 실착공(4/20) ○ `26.06 케이블 포설 및 케이블 접속 中 attachment_count 0 source_detail_sha256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|233331|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b6f4863530e8e723
Sources EV-d4a25426ae3a74140df8bdac Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962 행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_85762af576a613ba stable_project_key prjtDef:233331:ESB project_definition 233331 first_region_code ESB manual_source_format false project_name 154kV 동평택-북평택 지중T/L 건설사업 project_name_list 154kV 동평택-북평택 지중송전선로 건설사업 purpose 154KV 북평택S/S 단일계통 해소 project_region_detail Pyeongtaek, Gyeonggi Province project_period_raw 2025.12~2026.10 project_scale_raw 154KV XLPE 2,000㎟, 2C×3.4KM responsible_office_raw 경인건설본부/경기건설지사 equipment_type 지중송전 headquarters 경인건설본부 office 경기건설지사 current_stage_raw 사업승인-공사착수전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 사업승인-공사착수전 source_record_id stable_project_id:kproj_85762af576a613ba
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_85762af576a613ba
Sources EV-cc78862c36846f0ce486ad2d Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 24a040998926a2131119c9b4aa0f8565b66a103ae1ecbee3aa75140a92a80682 Observations for this power asset History for this project