POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 23items · current page 1–23 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-cc78862c36846f0ce486ad2d
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_85762af576a613ba
stable_project_keyprjtDef:233331:ESB
project_definition233331
first_region_codeESB
manual_source_formatfalse
project_name154kV 동평택-북평택 지중T/L 건설사업
project_name_list154kV 동평택-북평택 지중송전선로 건설사업
purpose154KV 북평택S/S 단일계통 해소
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2025.12~2026.10
project_scale_raw154KV XLPE 2,000㎟, 2C×3.4KM
responsible_office_raw경인건설본부/경기건설지사
equipment_type지중송전
headquarters경인건설본부
office경기건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b6f4863530e8e723
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_85762af576a613ba

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_85762af576a613ba

Sources EV-cc78862c36846f0ce486ad2d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 24a040998926a2131119c9b4aa0f8565b66a103ae1ecbee3aa75140a92a80682
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2025-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2025-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2025-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2025-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-04-06
date_precisionday
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source schedule candidates · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233331|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source snapshots by date · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_b6f4863530e8e723
stable_project_idkproj_85762af576a613ba
source_key202609|233331|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 동평택-북평택 지중송전선로 건설사업
project_name_detail154kV 동평택-북평택 지중T/L 건설사업
region_summary_raw경기도 평택시등 1 지역
equipment_type_raw지중송전
headquarters_raw경인건설본부
office_raw경기건설지사
section_fields
Project purpose
  • 154KV 북평택S/S 단일계통 해소
Project region
  • Pyeongtaek, Gyeonggi Province
Project period
  • 2025.12~2026.10
사업 규모
  • 154KV XLPE 2,000㎟, 2C×3.4KM
담당 사업소
  • 경인건설본부/경기건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • 1. 사업명 : 154kV 동평택-북평택 지중송전선로 건설사업 2. 사업개요 □ 사업목적 : 154kV 북평택변전소 단일계통 해소 □ 사업지역 - 경기 평택시 고덕동 2524(동평택 변전소) ~ 경기 평택시 고덕동 2278-2(북평택 변전소) □ 사업기간 : 2025.12 ~ 2027.03 □ 사업규모 : 154KV XLPE 2,000㎟, 2C×3.4KM □ 담당사업소 : 경인건설본부 경기건설지사 □ 담당자: [redacted], 2025.09] □ 도급공사 착공[(주)태유전력, 2025.12] □ 용역공사 착공[(주)건축사사무소 테크뱅크, 2026.03] □ 공사 진행 중(포설10/12, 접속 8/14) 中
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 2025.04 ~ 2025.07 기본설계: 2025.02 ~ 2025.04 실시설계: 2025.04 ~ 2025.07 설계담당자: [redacted]
○ '25.07 : 실시설계 완료 ○ `25.04 기본설계완료 ○ `25.04 토목공법변경(추진관압입→지향성압입) ○ `25.07 실시설계 완료 ○ `25.09 주자재 계약완료[일진전기(주)] ○ `25.09 토목 맨홀 위치 변경 ○ `25.12 공사 계약완료[(주)태유전력] 및 공사중지 ○ `26.03 감리용역 계약[(주)건축사사무소 테크뱅크] 및 공사신고 ○ `26.04 전기사업용 전기설비 공사계획 신고 수리[에너지관리과-10731(’26.04.06)] ○ `26.04 착공전 청렴·품질·안전 회의 시행(4/15) 및 실착공(4/20) ○ `26.06 케이블 포설 및 케이블 접속 中
future_plan_redacted□ 향후계획 ○ '25.07 : 실시설계 완료 ○ `25.04 기본설계완료 ○ `25.04 토목공법변경(추진관압입→지향성압입) ○ `25.07 실시설계 완료 ○ `25.09 주자재 계약완료[일진전기(주)] ○ `25.09 토목 맨홀 위치 변경 ○ `25.12 공사 계약완료[(주)태유전력] 및 공사중지 ○ `26.03 감리용역 계약[(주)건축사사무소 테크뱅크] 및 공사신고 ○ `26.04 전기사업용 전기설비 공사계획 신고 수리[에너지관리과-10731(’26.04.06)] ○ `26.04 착공전 청렴·품질·안전 회의 시행(4/15) 및 실착공(4/20) ○ `26.06 케이블 포설 및 케이블 접속 中
attachment_count0
source_detail_sha256704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233331|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_b6f4863530e8e723

Sources EV-d4a25426ae3a74140df8bdac
Evidence SHA-256 704a20c25db6a588adc7538e400ef56647b6afb4f821482b25a87b22de5da962
행 SHA-256 ef5f762d630d097021f801c71e2e94690b191e7d97bdc6a539019fea7b6612ee
Source snapshots by date · KOR · kepco_planned

154kV 동평택-북평택 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_85762af576a613ba
stable_project_keyprjtDef:233331:ESB
project_definition233331
first_region_codeESB
manual_source_formatfalse
project_name154kV 동평택-북평택 지중T/L 건설사업
project_name_list154kV 동평택-북평택 지중송전선로 건설사업
purpose154KV 북평택S/S 단일계통 해소
project_region_detailPyeongtaek, Gyeonggi Province
project_period_raw2025.12~2026.10
project_scale_raw154KV XLPE 2,000㎟, 2C×3.4KM
responsible_office_raw경인건설본부/경기건설지사
equipment_type지중송전
headquarters경인건설본부
office경기건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_b6f4863530e8e723
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_85762af576a613ba

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_85762af576a613ba

Sources EV-cc78862c36846f0ce486ad2d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 24a040998926a2131119c9b4aa0f8565b66a103ae1ecbee3aa75140a92a80682

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel