154kV 문경분기 건설사업
Power project · Construction project
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| project_name_voltage_label | 154 kV | literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-497bef838c3ffa7ee91c9efc |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| stable_project_id | kproj_7bf4cb9132765f1b |
| stable_project_key | prjtDef:232505:ESB |
| project_definition | 232505 |
| first_region_code | ESB |
| manual_source_format | false |
| project_name | 154kV 문경분기 건설사업 |
| project_name_list | 154kV 문경분기 송전선로 건설사업 |
| purpose | (기설) 154KV 문경S/S 계통보강 |
| project_region_detail | 경상북도 문경시 |
| project_period_raw | 2018.10~2026.10 |
| project_scale_raw | ACSR 330㎣×S×2C - 11.4KM, 28기 |
| responsible_office_raw | 남부건설본부/대구경북건설지사 |
| equipment_type | 가공송전 |
| headquarters | 남부건설본부 |
| office | 대구경북건설지사 |
| current_stage_raw | 공사착수-사업완료전 |
| snapshot_count | 1 |
| active_snapshot_count | 1 |
| snapshot_ids |
|
| first_seen_at | 2026-10-02 |
| last_confirmed_at | 2026-10-02T01:55:13Z |
| location_precision | region_only |
| geometry_semantics | no_verified_geometry |
| geometry | Not obtained |
| source_list_url | https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do |
| source_detail_url | https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do |
| Original text | 공사착수-사업완료전 |
| source_record_id | stable_project_id:kproj_7bf4cb9132765f1b |
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items
Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_7bf4cb9132765f1b
Sources EV-497bef838c3ffa7ee91c9efcEvidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1c22d7d7a386a5f3817a30d383e1a7547cdb83e9f39a185a1d1e8566256014c9