South Korea · Power project

154kV 동비응-서비응 지중T/L 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 동비응-서비응 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-e10bef284647fce4765eec20
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_652fda336d90cb28
stable_project_keyprjtDef:233896:ESB
project_definition233896
first_region_codeESB
manual_source_formatfalse
project_name154kV 동비응-서비응 지중T/L 건설사업
project_name_list154kV 동비응-서비응 지중송전선로 건설사업
purpose새만금산단 신규부하 공급 및 계통보강
project_region_detail전북특별자치도 군산시
project_period_raw2024.10~2028.12
project_scale_raw154KV XLPE 2000㎟, 2C × 2.0㎞
responsible_office_raw중부건설본부/전북건설지사
equipment_type지중송전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_bb7c3078975fa986
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_652fda336d90cb28

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_652fda336d90cb28

Sources EV-e10bef284647fce4765eec20
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 37df5aaf25293a067158ff591da8e0843b72393df6a31f2474a31d843cd7c792

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel