POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 9items · current page 1–9 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 동비응-서비응 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-e10bef284647fce4765eec20
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_652fda336d90cb28
stable_project_keyprjtDef:233896:ESB
project_definition233896
first_region_codeESB
manual_source_formatfalse
project_name154kV 동비응-서비응 지중T/L 건설사업
project_name_list154kV 동비응-서비응 지중송전선로 건설사업
purpose새만금산단 신규부하 공급 및 계통보강
project_region_detail전북특별자치도 군산시
project_period_raw2024.10~2028.12
project_scale_raw154KV XLPE 2000㎟, 2C × 2.0㎞
responsible_office_raw중부건설본부/전북건설지사
equipment_type지중송전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_bb7c3078975fa986
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_652fda336d90cb28

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_652fda336d90cb28

Sources EV-e10bef284647fce4765eec20
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 37df5aaf25293a067158ff591da8e0843b72393df6a31f2474a31d843cd7c792
Source schedule candidates · KOR · kepco_planned

154kV 동비응-서비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2027-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233896|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bb7c3078975fa986

Sources EV-8e8f289c679b949b052cbfac
Evidence SHA-256 8378670aa450bc1d3cbe549de1146f91e6ff07a21077c6f43ad5c2df66d449f1
행 SHA-256 db0afc028397f701fb44fa6f071d680ebc17c1c3a737c65ff087a2641a300bf8
Source schedule candidates · KOR · kepco_planned

154kV 동비응-서비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233896|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bb7c3078975fa986

Sources EV-8e8f289c679b949b052cbfac
Evidence SHA-256 8378670aa450bc1d3cbe549de1146f91e6ff07a21077c6f43ad5c2df66d449f1
행 SHA-256 db0afc028397f701fb44fa6f071d680ebc17c1c3a737c65ff087a2641a300bf8
Source schedule candidates · KOR · kepco_planned

154kV 동비응-서비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233896|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bb7c3078975fa986

Sources EV-8e8f289c679b949b052cbfac
Evidence SHA-256 8378670aa450bc1d3cbe549de1146f91e6ff07a21077c6f43ad5c2df66d449f1
행 SHA-256 db0afc028397f701fb44fa6f071d680ebc17c1c3a737c65ff087a2641a300bf8
Source schedule candidates · KOR · kepco_planned

154kV 동비응-서비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2024-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233896|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bb7c3078975fa986

Sources EV-8e8f289c679b949b052cbfac
Evidence SHA-256 8378670aa450bc1d3cbe549de1146f91e6ff07a21077c6f43ad5c2df66d449f1
행 SHA-256 db0afc028397f701fb44fa6f071d680ebc17c1c3a737c65ff087a2641a300bf8
Source schedule candidates · KOR · kepco_planned

154kV 동비응-서비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-01
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233896|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bb7c3078975fa986

Sources EV-8e8f289c679b949b052cbfac
Evidence SHA-256 8378670aa450bc1d3cbe549de1146f91e6ff07a21077c6f43ad5c2df66d449f1
행 SHA-256 db0afc028397f701fb44fa6f071d680ebc17c1c3a737c65ff087a2641a300bf8
Source schedule candidates · KOR · kepco_planned

154kV 동비응-서비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typedesign_completion
date2026-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233896|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bb7c3078975fa986

Sources EV-8e8f289c679b949b052cbfac
Evidence SHA-256 8378670aa450bc1d3cbe549de1146f91e6ff07a21077c6f43ad5c2df66d449f1
행 SHA-256 db0afc028397f701fb44fa6f071d680ebc17c1c3a737c65ff087a2641a300bf8
Source snapshots by date · KOR · kepco_planned

154kV 동비응-서비응 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_bb7c3078975fa986
stable_project_idkproj_652fda336d90cb28
source_key202609|233896|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 동비응-서비응 지중송전선로 건설사업
project_name_detail154kV 동비응-서비응 지중T/L 건설사업
region_summary_raw전북특별자치도 군산시등 1 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw전북건설지사
section_fields
Project purpose
  • 새만금산단 신규부하 공급 및 계통보강
Project region
  • 전북특별자치도 군산시
Project period
  • 2024.10~2028.12
사업 규모
  • 154KV XLPE 2000㎟, 2C × 2.0㎞
담당 사업소
  • 중부건설본부/전북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
[진행경과] □‘25.06.: 11차 장기송변전 설비계획 반영 □‘26.01 : 동비응~서비응S/S 일부구간 케이블 전용교 설치 디자인 협의 완료(새만금개발청) □‘26.08 : 케이블공사 기본설계완료 [향후계획] □‘27.02 : 케이블공사 실시설계완료
future_plan_redacted□ 향후계획 [진행경과] □‘25.06.: 11차 장기송변전 설비계획 반영 □‘26.01 : 동비응~서비응S/S 일부구간 케이블 전용교 설치 디자인 협의 완료(새만금개발청) □‘26.08 : 케이블공사 기본설계완료 [향후계획] □‘27.02 : 케이블공사 실시설계완료
attachment_count0
source_detail_sha2568378670aa450bc1d3cbe549de1146f91e6ff07a21077c6f43ad5c2df66d449f1
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233896|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_bb7c3078975fa986

Sources EV-8e8f289c679b949b052cbfac
Evidence SHA-256 8378670aa450bc1d3cbe549de1146f91e6ff07a21077c6f43ad5c2df66d449f1
행 SHA-256 db0afc028397f701fb44fa6f071d680ebc17c1c3a737c65ff087a2641a300bf8
Source snapshots by date · KOR · kepco_planned

154kV 동비응-서비응 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_652fda336d90cb28
stable_project_keyprjtDef:233896:ESB
project_definition233896
first_region_codeESB
manual_source_formatfalse
project_name154kV 동비응-서비응 지중T/L 건설사업
project_name_list154kV 동비응-서비응 지중송전선로 건설사업
purpose새만금산단 신규부하 공급 및 계통보강
project_region_detail전북특별자치도 군산시
project_period_raw2024.10~2028.12
project_scale_raw154KV XLPE 2000㎟, 2C × 2.0㎞
responsible_office_raw중부건설본부/전북건설지사
equipment_type지중송전
headquarters중부건설본부
office전북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_bb7c3078975fa986
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_652fda336d90cb28

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_652fda336d90cb28

Sources EV-e10bef284647fce4765eec20
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 37df5aaf25293a067158ff591da8e0843b72393df6a31f2474a31d843cd7c792

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel