South Korea · Power project

154kV 대곡분기T/L 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 대곡분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-a8c80f6245f0f5cb36130398
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_5af77ca6ed07bd8c
stable_project_keyprjtDef:232761:ESB
project_definition232761
first_region_codeESB
manual_source_formatfalse
project_name154kV 대곡분기T/L 건설사업
project_name_list154kV 대곡분기 송전선로 건설사업
purpose대곡지구 전력공급 및 인근변전소 부하분담
project_region_detail경기도 고양시 일산동구
project_period_raw
project_scale_raw154KV 고양-일산T/L 2Π분기 A410B 4C 0.5KM
responsible_office_raw경인건설본부/직할
equipment_type가공송전
headquarters경인건설본부
office직할
current_stage_raw
snapshot_count1
active_snapshot_count0
snapshot_ids
  • ksnap_db40808578ca930b
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text
source_record_idstable_project_id:kproj_5af77ca6ed07bd8c

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_5af77ca6ed07bd8c

Sources EV-a8c80f6245f0f5cb36130398
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 1c9c08ea547559e00951d4c5853c4af6aee8244896e33093461d4d23c9fdabd4

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel