South Korea · Power project

154kV 북세종분기 지중T/L 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 북세종분기 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-103c104872dbcfe48aa1d36a
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_1b6727a5656c3223
stable_project_keyprjtDef:233923:ESB
project_definition233923
first_region_codeESB
manual_source_formatfalse
project_name154kV 북세종분기 지중T/L 건설사업
project_name_list154kV 북세종분기 지중송전선로 건설사업
purpose행정중심복합도시(6-2생) 개발에 따른 신규부하 공급
project_region_detailSejong Special Self-Governing City
project_period_raw2027.01~2028.12
project_scale_rawXLPE 2,000㎟ X 4C 0.5KM
responsible_office_raw중부건설본부/직할
equipment_type지중송전
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e46c853d65028996
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_1b6727a5656c3223

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_1b6727a5656c3223

Sources EV-103c104872dbcfe48aa1d36a
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 54d2edd57e661d23121c8598de5ab8b223237823f5639bcce863c4dcdee523a3

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel