POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 8items · current page 1–8 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 북세종분기 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-103c104872dbcfe48aa1d36a
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_1b6727a5656c3223
stable_project_keyprjtDef:233923:ESB
project_definition233923
first_region_codeESB
manual_source_formatfalse
project_name154kV 북세종분기 지중T/L 건설사업
project_name_list154kV 북세종분기 지중송전선로 건설사업
purpose행정중심복합도시(6-2생) 개발에 따른 신규부하 공급
project_region_detailSejong Special Self-Governing City
project_period_raw2027.01~2028.12
project_scale_rawXLPE 2,000㎟ X 4C 0.5KM
responsible_office_raw중부건설본부/직할
equipment_type지중송전
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e46c853d65028996
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_1b6727a5656c3223

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_1b6727a5656c3223

Sources EV-103c104872dbcfe48aa1d36a
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 54d2edd57e661d23121c8598de5ab8b223237823f5639bcce863c4dcdee523a3
Source schedule candidates · KOR · kepco_planned

154kV 북세종분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2027-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233923|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e46c853d65028996

Sources EV-5d980ec9e05e8a7dfb1320c5
Evidence SHA-256 304f1155ca60ff82d48c12aa544627b012ac22053aa6d4af8df48c06657eb319
행 SHA-256 02d2d40dacfa392cf57332e4d6e7453cfa71a7670ecf153a38ed7d3c0f0271ae
Source schedule candidates · KOR · kepco_planned

154kV 북세종분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233923|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e46c853d65028996

Sources EV-5d980ec9e05e8a7dfb1320c5
Evidence SHA-256 304f1155ca60ff82d48c12aa544627b012ac22053aa6d4af8df48c06657eb319
행 SHA-256 02d2d40dacfa392cf57332e4d6e7453cfa71a7670ecf153a38ed7d3c0f0271ae
Source schedule candidates · KOR · kepco_planned

154kV 북세종분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2028-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233923|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e46c853d65028996

Sources EV-5d980ec9e05e8a7dfb1320c5
Evidence SHA-256 304f1155ca60ff82d48c12aa544627b012ac22053aa6d4af8df48c06657eb319
행 SHA-256 02d2d40dacfa392cf57332e4d6e7453cfa71a7670ecf153a38ed7d3c0f0271ae
Source schedule candidates · KOR · kepco_planned

154kV 북세종분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2027-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|233923|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e46c853d65028996

Sources EV-5d980ec9e05e8a7dfb1320c5
Evidence SHA-256 304f1155ca60ff82d48c12aa544627b012ac22053aa6d4af8df48c06657eb319
행 SHA-256 02d2d40dacfa392cf57332e4d6e7453cfa71a7670ecf153a38ed7d3c0f0271ae
Source schedule candidates · KOR · kepco_planned

154kV 북세종분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233923|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e46c853d65028996

Sources EV-5d980ec9e05e8a7dfb1320c5
Evidence SHA-256 304f1155ca60ff82d48c12aa544627b012ac22053aa6d4af8df48c06657eb319
행 SHA-256 02d2d40dacfa392cf57332e4d6e7453cfa71a7670ecf153a38ed7d3c0f0271ae
Source snapshots by date · KOR · kepco_planned

154kV 북세종분기 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_e46c853d65028996
stable_project_idkproj_1b6727a5656c3223
source_key202609|233923|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 북세종분기 지중송전선로 건설사업
project_name_detail154kV 북세종분기 지중T/L 건설사업
region_summary_raw세종특별자치시등 1 지역
equipment_type_raw지중송전
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 행정중심복합도시(6-2생) 개발에 따른 신규부하 공급
Project region
  • Sejong Special Self-Governing City
Project period
  • 2027.01~2028.12
사업 규모
  • XLPE 2,000㎟ X 4C 0.5KM
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
○ '25.05 11차 장기송변전설비계획 반영 ○ '27.11 착공 ○ '28.10 준공
future_plan_redacted□ 향후계획 ○ '25.05 11차 장기송변전설비계획 반영 ○ '27.11 착공 ○ '28.10 준공
attachment_count0
source_detail_sha256304f1155ca60ff82d48c12aa544627b012ac22053aa6d4af8df48c06657eb319
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233923|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_e46c853d65028996

Sources EV-5d980ec9e05e8a7dfb1320c5
Evidence SHA-256 304f1155ca60ff82d48c12aa544627b012ac22053aa6d4af8df48c06657eb319
행 SHA-256 02d2d40dacfa392cf57332e4d6e7453cfa71a7670ecf153a38ed7d3c0f0271ae
Source snapshots by date · KOR · kepco_planned

154kV 북세종분기 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_1b6727a5656c3223
stable_project_keyprjtDef:233923:ESB
project_definition233923
first_region_codeESB
manual_source_formatfalse
project_name154kV 북세종분기 지중T/L 건설사업
project_name_list154kV 북세종분기 지중송전선로 건설사업
purpose행정중심복합도시(6-2생) 개발에 따른 신규부하 공급
project_region_detailSejong Special Self-Governing City
project_period_raw2027.01~2028.12
project_scale_rawXLPE 2,000㎟ X 4C 0.5KM
responsible_office_raw중부건설본부/직할
equipment_type지중송전
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_e46c853d65028996
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_1b6727a5656c3223

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_1b6727a5656c3223

Sources EV-103c104872dbcfe48aa1d36a
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 54d2edd57e661d23121c8598de5ab8b223237823f5639bcce863c4dcdee523a3

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel