South Korea · Power project

154kV 광석분기 전력구 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 광석분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-1a951e8b81e27ba2184c1c9c
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0d9f06b93d463957
stable_project_keyprjtDef:234157:ESB
project_definition234157
first_region_codeESB
manual_source_formatfalse
project_name154kV 광석분기 전력구 건설사업
project_name_list시흥-안산지역 전기공급시설 전력구공사(광석분기)
purpose시흥,안산지역 신규부하 및 안정적 전력공급
project_region_detail경기도 시흥시
project_period_raw2022.03~2026.12
project_scale_raw개착식 전력구 42M, 터널식 전력구 4,019M
responsible_office_raw경인건설본부/남서울인천건설지사
equipment_type전력구
headquarters경인건설본부
office남서울인천건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_1addb4b7ce350c3c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_0d9f06b93d463957

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0d9f06b93d463957

Sources EV-1a951e8b81e27ba2184c1c9c
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 4e654bd452638a5148c5a2aca3b4f9bb1c10c85dda7a21047987ac1a57b75dd6

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel