South Korea · Power project

154kV 북성주분기 전력구 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-09
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 북성주분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-7d672d3130f96bdc034742ce
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_0d85726fe58d5082
stable_project_keyprjtDef:234700:ESB
project_definition234700
first_region_codeESB
manual_source_formatfalse
project_name154kV 북성주분기 전력구 건설사업
project_name_list성주지역 전기공급시설 전려구공사(북성주분기)
purpose성주2산단 전력공급 및 인근 변전소 과부하 해소
project_region_detail경상북도 성주군
project_period_raw2023.10~2026.10
project_scale_raw전력구 93M, 환기구 1개소
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type전력구
headquarters남부건설본부
office대구경북건설지사
current_stage_raw공사착수-사업완료전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_6b350b32b8a6967f
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text공사착수-사업완료전
source_record_idstable_project_id:kproj_0d85726fe58d5082

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_0d85726fe58d5082

Sources EV-7d672d3130f96bdc034742ce
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 9ee06e2db782f3075aa113f7e8c775bdc7b63490c33d978358afe6bdb8c88aec

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel