South Korea · Power project

154kV 명례#2개폐소분기T/L 건설사업

공식 원천의 전력 객체 · Construction project

Project stage · source basis
Stage requires verification · construction_project
Reported operator
Check each original source
Address
Check each original source
Data Reference Date
2026-10
Collection review date
2026-10-02
Location meaning
Location meaning unverified · Accuracy not disclosed
Coordinates and geometry
Coordinates need review

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · KOR · kepco_planned

154kV 명례#2개폐소분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-10
Sources EV-0c1cd9c4ecc58c445a4c356d
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_06d31cda9833cc16
stable_project_keyprjtDef:232425:ESB
project_definition232425
first_region_codeESB
manual_source_formatfalse
project_name154kV 명례#2개폐소분기T/L 건설사업
project_name_list154kV 명례#2개폐소분기T/L 건설사업
purpose명례-장안T/L 고장대비 계통보강
project_region_detailGijang County, Busan Metropolitan City
project_period_raw2025.06~2031.10
project_scale_rawACSR 330㎟ X S X 6C - 0.1KM
responsible_office_raw남부건설본부/직할
equipment_type가공송전
headquarters남부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count2
active_snapshot_count2
snapshot_ids
  • ksnap_7c8f0e7eda735156
  • ksnap_e595f52d68e5c030
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_06d31cda9833cc16

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-10 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_06d31cda9833cc16

Sources EV-0c1cd9c4ecc58c445a4c356d
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 d01204e0fb770c57911eff30afe6c0e3616f415e4f9f874591aeefabc8fb1eab

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel