United States of America · Generation facilities

315 Vinson Road

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Red Toad 315 Vinson Road, LLC
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
35.629398, -78.385888

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

315 Vinson Road

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)23 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-2eb32d61059672ab56fd1f33
Detailed source fields
Original source fieldPublished value or condition
Utility ID63634
Utility NameRed Toad 315 Vinson Road, LLC
Plant Code63979
Plant Name315 Vinson Road
Street Address315 Vinson Road
CityClayton
StateNC
Zip27527
CountyJohnston
Latitude35.629398
Longitude-78.385888
NERC RegionSERC
Balancing Authority CodeCPLE
Balancing Authority NameDuke Energy Progress East
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusY
FERC Small Power Producer Docket Number15-758-000, 15-758-001, 15-758-004, 15-758-005
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Ash Impoundment Lined?X
Transmission or Distribution System OwnerDuke Energy Progress - (NC)
Transmission or Distribution System Owner ID3046
Transmission or Distribution System Owner StateNC
Grid Voltage (kV)23
Energy StorageN
Natural Gas StorageN
Liquefied Natural Gas StorageX
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:11239

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:11239

Sources EV-2eb32d61059672ab56fd1f33
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 09c7703f2231b79e2150de1f1555f3dd4d0b7f9f896edfb46d79a8fae1d7a3df

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel