Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
315 Vinson Road
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
23 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-2eb32d61059672ab56fd1f33
Detailed source fields
Original source field
Published value or condition
Utility ID
63634
Utility Name
Red Toad 315 Vinson Road, LLC
Plant Code
63979
Plant Name
315 Vinson Road
Street Address
315 Vinson Road
City
Clayton
State
NC
Zip
27527
County
Johnston
Latitude
35.629398
Longitude
-78.385888
NERC Region
SERC
Balancing Authority Code
CPLE
Balancing Authority Name
Duke Energy Progress East
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
15-758-000, 15-758-001, 15-758-004, 15-758-005
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Duke Energy Progress - (NC)
Transmission or Distribution System Owner ID
3046
Transmission or Distribution System Owner State
NC
Grid Voltage (kV)
23
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:11239
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.