电力对象与项目 · USA · eia860

315 Vinson Road

发电设施 · 未确认

指标或条件原文数值口径、范围及阶段
Grid Voltage (kV)23 kV原始来源列定义 · 发电厂 · 未确认
基准日期 2025
依据 EV-2eb32d61059672ab56fd1f33
原始来源详细字段
原始来源字段公开数值或条件
Utility ID63634
Utility NameRed Toad 315 Vinson Road, LLC
Plant Code63979
Plant Name315 Vinson Road
Street Address315 Vinson Road
CityClayton
StateNC
Zip27527
CountyJohnston
Latitude35.629398
Longitude-78.385888
NERC RegionSERC
Balancing Authority CodeCPLE
Balancing Authority NameDuke Energy Progress East
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusY
FERC Small Power Producer Docket Number15-758-000, 15-758-001, 15-758-004, 15-758-005
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Ash Impoundment Lined?X
Transmission or Distribution System OwnerDuke Energy Progress - (NC)
Transmission or Distribution System Owner ID3046
Transmission or Distribution System Owner StateNC
Grid Voltage (kV)23
Energy StorageN
Natural Gas StorageN
Liquefied Natural Gas StorageX
坐标精度source_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:11239

Coordinates locate the plant, including when this record describes one generator.

位置: 电厂位置 · 非单台发电机位置

原文、基准日期与核实日期 1条
eia860 ↗

数据来源 2025 · 收集核实 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

原文位置 2___Plant_Y2025.xlsx#Plant:11239

依据 EV-2eb32d61059672ab56fd1f33
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 09c7703f2231b79e2150de1f1555f3dd4d0b7f9f896edfb46d79a8fae1d7a3df

使用条件 US government public domain

来源各时点记录 · USA · eia860

315 Vinson Road

发电厂 · 未确认

指标或条件原文数值口径、范围及阶段
原始来源详细字段
原始来源字段公开数值或条件
Utility ID63634
Utility NameRed Toad 315 Vinson Road, LLC
Plant Code63979
Plant Name315 Vinson Road
Street Address315 Vinson Road
CityClayton
StateNC
Zip27527
CountyJohnston
Latitude35.629398
Longitude-78.385888
NERC RegionSERC
Balancing Authority CodeCPLE
Balancing Authority NameDuke Energy Progress East
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusY
FERC Small Power Producer Docket Number15-758-000, 15-758-001, 15-758-004, 15-758-005
FERC Exempt Wholesale Generator StatusN
Ash Impoundment?N
Ash Impoundment Lined?X
Transmission or Distribution System OwnerDuke Energy Progress - (NC)
Transmission or Distribution System Owner ID3046
Transmission or Distribution System Owner StateNC
Grid Voltage (kV)23
Energy StorageN
Natural Gas StorageN
Liquefied Natural Gas StorageX
source_record_id2___Plant_Y2025.xlsx#Plant:11239

没有单独的指标汇总,请查看原始来源详细字段。

原文、基准日期与核实日期 1条
eia860 ↗

数据来源 2025 · 收集核实 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

原文位置 2___Plant_Y2025.xlsx#Plant:11239

依据 EV-2eb32d61059672ab56fd1f33
资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 09c7703f2231b79e2150de1f1555f3dd4d0b7f9f896edfb46d79a8fae1d7a3df

使用条件 US government public domain

开始咨询 · 选择渠道