E. Goenner Project CSG
Generation facilities · Unverified
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Grid Voltage (kV) | 34.5 kV | Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-46f759db474e22df4aa376b1 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Utility ID | 62963 |
| Utility Name | E. Goenner Community Solar LLC |
| Plant Code | 63175 |
| Plant Name | E. Goenner Project CSG |
| Street Address | 3356 River Rd SE |
| City | Clear Lake |
| State | MN |
| Zip | 55319 |
| County | Sherburne |
| Latitude | 45.463956 |
| Longitude | -94.091014 |
| NERC Region | MRO |
| Balancing Authority Code | MISO |
| Balancing Authority Name | Midcontinent Independent Transmission System Operator, Inc.. |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | NR |
| Sector | 2 |
| Sector Name | IPP Non-CHP |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | N |
| FERC Exempt Wholesale Generator Status | N |
| Transmission or Distribution System Owner | Northern States Power Co - Minnesota |
| Transmission or Distribution System Owner ID | 13781 |
| Transmission or Distribution System Owner State | MN |
| Grid Voltage (kV) | 34.5 |
| Energy Storage | N |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:10498 |
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 2___Plant_Y2025.xlsx#Plant:10498
Sources EV-46f759db474e22df4aa376b1Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 4a65948be72b861dd8f7cb7117a269c36ce2a28617b9a56fe7322880afb5dbd0
Usage terms US government public domain
