E. Goenner Project CSG
발전시설 · 미확인
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Grid Voltage (kV) | 34.5 kV | 원출처 열 정의 · 발전소 · 미확인 기준일 2025 근거 EV-46f759db474e22df4aa376b1 |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Utility ID | 62963 |
| Utility Name | E. Goenner Community Solar LLC |
| Plant Code | 63175 |
| Plant Name | E. Goenner Project CSG |
| Street Address | 3356 River Rd SE |
| City | Clear Lake |
| State | MN |
| Zip | 55319 |
| County | Sherburne |
| Latitude | 45.463956 |
| Longitude | -94.091014 |
| NERC Region | MRO |
| Balancing Authority Code | MISO |
| Balancing Authority Name | Midcontinent Independent Transmission System Operator, Inc.. |
| Primary Purpose (NAICS Code) | 22 |
| Regulatory Status | NR |
| Sector | 2 |
| Sector Name | IPP Non-CHP |
| FERC Cogeneration Status | N |
| FERC Small Power Producer Status | N |
| FERC Exempt Wholesale Generator Status | N |
| Transmission or Distribution System Owner | Northern States Power Co - Minnesota |
| Transmission or Distribution System Owner ID | 13781 |
| Transmission or Distribution System Owner State | MN |
| Grid Voltage (kV) | 34.5 |
| Energy Storage | N |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | 2___Plant_Y2025.xlsx#Plant:10498 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 1건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 2___Plant_Y2025.xlsx#Plant:10498
근거 EV-46f759db474e22df4aa376b1자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 4a65948be72b861dd8f7cb7117a269c36ce2a28617b9a56fe7322880afb5dbd0
