United States of America · Generation facilities

Intel Folsom Phase 2

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
Tesla Inc.
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
38.643611, -121.163889

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Intel Folsom Phase 2

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)0.48 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-df754d332dac3580a35c587a
Detailed source fields
Original source fieldPublished value or condition
Utility ID57313
Utility NameTesla Inc.
Plant Code58954
Plant NameIntel Folsom Phase 2
Street Address1900 Prairie City Rd
CityFolsom
StateCA
Zip95360
CountySacramento
Latitude38.643611
Longitude-121.163889
NERC RegionWECC
Balancing Authority CodeBANC
Balancing Authority NameBalancing Authority of Northern California
Primary Purpose (NAICS Code)22
Regulatory StatusNR
Sector2
Sector NameIPP Non-CHP
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment Lined?X
Transmission or Distribution System OwnerSacramento Municipal Util Dist
Transmission or Distribution System Owner ID16534
Transmission or Distribution System Owner StateCA
Grid Voltage (kV)0.48
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:6825

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:6825

Sources EV-df754d332dac3580a35c587a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 86f7c0feafdb1fcd5460181595cfced690719b3466bd91ddcfd7d18d292cb16a

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel