Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Intel Folsom Phase 2
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
0.48 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-df754d332dac3580a35c587a
Detailed source fields
Original source field
Published value or condition
Utility ID
57313
Utility Name
Tesla Inc.
Plant Code
58954
Plant Name
Intel Folsom Phase 2
Street Address
1900 Prairie City Rd
City
Folsom
State
CA
Zip
95360
County
Sacramento
Latitude
38.643611
Longitude
-121.163889
NERC Region
WECC
Balancing Authority Code
BANC
Balancing Authority Name
Balancing Authority of Northern California
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Sacramento Municipal Util Dist
Transmission or Distribution System Owner ID
16534
Transmission or Distribution System Owner State
CA
Grid Voltage (kV)
0.48
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:6825
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.