United States of America · Generation facilities

Glenrock

공식 원천의 전력 객체 · Unverified

Project stage · source basis
Stage requires verification · unknown
Reported operator
PacifiCorp
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
43.0181, -105.835278

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860

Glenrock

Generation facilities · Unverified

Metric or conditionSource valueBasis, scope and stage
Grid Voltage (kV)230 kVOriginal source column definition · Power plant · Unverified
As-of date 2025
Sources EV-9e4ec21330d856c259f2d8eb
Detailed source fields
Original source fieldPublished value or condition
Utility ID14354
Utility NamePacifiCorp
Plant Code56841
Plant NameGlenrock
Street Address1028 - 55 Ranch Road
CityGlenrock
StateWY
Zip82637
CountyConverse
Latitude43.0181
Longitude-105.835278
NERC RegionWECC
Balancing Authority CodePACE
Balancing Authority NamePacifiCorp - East
Primary Purpose (NAICS Code)22
Regulatory StatusRE
Sector1
Sector NameElectric Utility
FERC Cogeneration StatusN
FERC Small Power Producer StatusN
FERC Exempt Wholesale Generator StatusN
Ash Impoundment Lined?X
Transmission or Distribution System OwnerPacifiCorp
Transmission or Distribution System Owner ID14354
Transmission or Distribution System Owner StateWY
Grid Voltage (kV)230
Energy StorageN
Coordinate accuracysource_precision_not_independently_surveyed
source_record_id2___Plant_Y2025.xlsx#Plant:5046

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 2___Plant_Y2025.xlsx#Plant:5046

Sources EV-9e4ec21330d856c259f2d8eb
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 111dfb81c89e53988a148a63a8bc77ab6f299a62078849f5baada607a26187a0

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel