United States of America · Generator · plant location

Allatoona / A

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
USCE-Mobile District
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
34.1637, -84.7282

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Allatoona / A

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0df8f22cc803fce33935bc76
Net Summer Capacity (MW)2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0df8f22cc803fce33935bc76
Net Winter Capacity (MW)2 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-0df8f22cc803fce33935bc76
Detailed source fields
Original source fieldPublished value or condition
Entity ID27813
Entity NameUSCE-Mobile District
Plant ID760
Plant NameAllatoona
Google MapMap
Bing MapMap
Plant StateGA
CountyBartow
Balancing Authority CodeSOCO
SectorElectric Utility
Generator IDA
Nameplate Capacity (MW)2
Net Summer Capacity (MW)2
Net Winter Capacity (MW)2
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month2
Operating Year1950
Status(OP) Operating
Latitude34.1637
Longitude-84.7282
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:1286

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1280

Sources EV-85f90c573d6086becb8d2f9f
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6cc37b701ae334217ffd2b21ca14b558e4f9d7b52daab750918ac6bd23b552f5

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1286

Sources EV-0df8f22cc803fce33935bc76
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b44f870bcc39c058b39fe4ad1fa3b272a23f1f667763e775841a518636418f56

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel