United States of America · Generator · plant location

Allatoona / 2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
USCE-Mobile District
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
34.1637, -84.7282

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Allatoona / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)42.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-66b562413ee9dee862e550f1
Net Summer Capacity (MW)35 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-66b562413ee9dee862e550f1
Net Winter Capacity (MW)35 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-66b562413ee9dee862e550f1
Detailed source fields
Original source fieldPublished value or condition
Entity ID27813
Entity NameUSCE-Mobile District
Plant ID760
Plant NameAllatoona
Google MapMap
Bing MapMap
Plant StateGA
CountyBartow
Balancing Authority CodeSOCO
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)42.3
Net Summer Capacity (MW)35
Net Winter Capacity (MW)35
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month3
Operating Year1950
Status(OP) Operating
Latitude34.1637
Longitude-84.7282
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:1285

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:1279

Sources EV-ed4519a18cfb109f2705b06d
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 226d5cce3de47f0869fdfeb18b1d28207d06ad0d1e4ad32980d27f910f336363

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:1285

Sources EV-66b562413ee9dee862e550f1
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 36fdd18466c1e277df4a35cedf9e118df264313d31410b66ff8fab8cbad7f362

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel