Lerdo Middle / LERMI
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 2.4 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-c5b956a2aad28de8362fa3f1 |
| Net Summer Capacity (MW) | 2.4 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-c5b956a2aad28de8362fa3f1 |
| Net Winter Capacity (MW) | 2.4 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-c5b956a2aad28de8362fa3f1 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 63689 |
| Entity Name | Wonderful Renewable Energy, LLC. |
| Plant ID | 70372 |
| Plant Name | Lerdo Middle |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | Kern |
| Balancing Authority Code | CISO |
| Sector | Industrial Non-CHP |
| Generator ID | LERMI |
| Nameplate Capacity (MW) | 2.4 |
| Net Summer Capacity (MW) | 2.4 |
| Net Winter Capacity (MW) | 2.4 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 8 |
| Planned Operation Year | 2026 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 35.50622 |
| Longitude | -119.162 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:9 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2783
Sources EV-fc6c79a15a14f4ba0d4a6333Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 46c99c7a192a631dc230cc95cdd255588bcc68af46c443cf061857ab050c5dbd
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:9
Sources EV-c5b956a2aad28de8362fa3f1Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 94a55c3af7d61d629975f7d72bef3aa361838f98169cf4ce6b0782cf4991b6ab
Usage terms US government public domain
