Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Lerdo Middle / LERMI
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
2.4 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-c5b956a2aad28de8362fa3f1
Net Summer Capacity (MW)
2.4 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-c5b956a2aad28de8362fa3f1
Net Winter Capacity (MW)
2.4 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-c5b956a2aad28de8362fa3f1
Detailed source fields
Original source field
Published value or condition
Entity ID
63689
Entity Name
Wonderful Renewable Energy, LLC.
Plant ID
70372
Plant Name
Lerdo Middle
Google Map
Map
Bing Map
Map
Plant State
CA
County
Kern
Balancing Authority Code
CISO
Sector
Industrial Non-CHP
Generator ID
LERMI
Nameplate Capacity (MW)
2.4
Net Summer Capacity (MW)
2.4
Net Winter Capacity (MW)
2.4
Technology
Solar Photovoltaic
Energy Source Code
SUN
Prime Mover Code
PV
Planned Operation Month
8
Planned Operation Year
2026
Status
(V) Under construction, more than 50 percent complete
Latitude
35.50622
Longitude
-119.162
Original text
(V) Under construction, more than 50 percent complete