POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Power assets and projects · USA · eia860m

Lerdo Middle / LERMI

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2.4 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-c5b956a2aad28de8362fa3f1
Net Summer Capacity (MW)2.4 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-c5b956a2aad28de8362fa3f1
Net Winter Capacity (MW)2.4 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-c5b956a2aad28de8362fa3f1
Detailed source fields
Original source fieldPublished value or condition
Entity ID63689
Entity NameWonderful Renewable Energy, LLC.
Plant ID70372
Plant NameLerdo Middle
Google MapMap
Bing MapMap
Plant StateCA
CountyKern
Balancing Authority CodeCISO
SectorIndustrial Non-CHP
Generator IDLERMI
Nameplate Capacity (MW)2.4
Net Summer Capacity (MW)2.4
Net Winter Capacity (MW)2.4
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month8
Planned Operation Year2026
Status(V) Under construction, more than 50 percent complete
Latitude35.50622
Longitude-119.162
Original text(V) Under construction, more than 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:9

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2783

Sources EV-fc6c79a15a14f4ba0d4a6333
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 46c99c7a192a631dc230cc95cdd255588bcc68af46c443cf061857ab050c5dbd

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:9

Sources EV-c5b956a2aad28de8362fa3f1
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 94a55c3af7d61d629975f7d72bef3aa361838f98169cf4ce6b0782cf4991b6ab

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Lerdo Middle / LERMI

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID63689
Entity NameWonderful Renewable Energy, LLC.
Plant ID70372
Plant NameLerdo Middle
Google MapMap
Bing MapMap
Plant StateCA
CountyKern
Balancing Authority CodeCISO
SectorIndustrial Non-CHP
Generator IDLERMI
Nameplate Capacity (MW)2.4
Net Summer Capacity (MW)2.4
Net Winter Capacity (MW)2.4
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month8
Planned Operation Year2026
Status(V) Under construction, more than 50 percent complete
Latitude35.50622
Longitude-119.162
Original text(V) Under construction, more than 50 percent complete
source_record_idPlanned:9

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:9

Sources EV-c5b956a2aad28de8362fa3f1
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 94a55c3af7d61d629975f7d72bef3aa361838f98169cf4ce6b0782cf4991b6ab

Usage terms US government public domain

Source snapshots by date · USA · eia860

Lerdo Middle / LERMI

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID63689
Utility NameWonderful Renewable Energy, LLC.
Plant Code70372
Plant NameLerdo Middle
StateCA
CountyKern
Generator IDLERMI
TechnologySolar Photovoltaic
Prime MoverPV
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)2.4
Summer Capacity (MW)2.4
Winter Capacity (MW)2.4
StatusV
Effective Month4
Effective Year2026
Current Month4
Current Year2026
Associated with Combined Heat and Power SystemN
Sector NameIndustrial Non-CHP
Sector6
Previously CanceledN
Energy Source 1SUN
Original textV
source_record_id3_1_Generator_Y2025.xlsx#Proposed:2783

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2783

Sources EV-fc6c79a15a14f4ba0d4a6333
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 46c99c7a192a631dc230cc95cdd255588bcc68af46c443cf061857ab050c5dbd

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel