Foundry Ridge Energy Center LLC / FNRD2
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 108 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-1e92ae82aa4a8675db8e082c |
| Net Summer Capacity (MW) | 108 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-1e92ae82aa4a8675db8e082c |
| Net Winter Capacity (MW) | 108 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-1e92ae82aa4a8675db8e082c |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 49893 |
| Entity Name | Invenergy Services LLC |
| Plant ID | 70360 |
| Plant Name | Foundry Ridge Energy Center LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | WI |
| County | Walworth |
| Balancing Authority Code | MISO |
| Sector | IPP Non-CHP |
| Generator ID | FNRD2 |
| Nameplate Capacity (MW) | 108 |
| Net Summer Capacity (MW) | 108 |
| Net Winter Capacity (MW) | 108 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 8 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 42.583072 |
| Longitude | -88.72461 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1655 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2770
Sources EV-ecc2ad5bdd20e5ae07311b5aEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 18851f80acf9045ef46d0909ca018a9a4f29c9b9bfacacdc93a8423616b715f2
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1655
Sources EV-1e92ae82aa4a8675db8e082cEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e5bb6316046ae427b458fed1fd7c01955a6453de569c07a65a97cdbe70f815b1
Usage terms US government public domain
