Foundry Ridge Energy Center LLC / FNRD2
発電機 · 計画
| 指標・条件 | 出典の値 | 基準・範囲・段階 |
|---|---|---|
| Nameplate Capacity (MW) | 108 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-1e92ae82aa4a8675db8e082c |
| Net Summer Capacity (MW) | 108 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-1e92ae82aa4a8675db8e082c |
| Net Winter Capacity (MW) | 108 MW | 原出典の列定義 · 発電機 · (P) Planned for installation, but regulatory approvals not initiated 基準日 2026-08 根拠 EV-1e92ae82aa4a8675db8e082c |
原出典の詳細項目
| 原出典項目 | 公開値・条件 |
|---|---|
| Entity ID | 49893 |
| Entity Name | Invenergy Services LLC |
| Plant ID | 70360 |
| Plant Name | Foundry Ridge Energy Center LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | WI |
| County | Walworth |
| Balancing Authority Code | MISO |
| Sector | IPP Non-CHP |
| Generator ID | FNRD2 |
| Nameplate Capacity (MW) | 108 |
| Net Summer Capacity (MW) | 108 |
| Net Winter Capacity (MW) | 108 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 8 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 42.583072 |
| Longitude | -88.72461 |
| 原文の状態 | (P) Planned for installation, but regulatory approvals not initiated |
| 座標精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1655 |
Coordinates locate the plant, including when this record describes one generator.
位置: 発電所の位置・個別発電機の位置ではない
原文・基準日・確認日 2件
資料の基準 2025 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 3_1_Generator_Y2025.xlsx#Proposed:2770
根拠 EV-ecc2ad5bdd20e5ae07311b5a資料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 18851f80acf9045ef46d0909ca018a9a4f29c9b9bfacacdc93a8423616b715f2
資料の基準 2026-08 ・取得確認 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文内の位置 Planned:1655
根拠 EV-1e92ae82aa4a8675db8e082c資料SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e5bb6316046ae427b458fed1fd7c01955a6453de569c07a65a97cdbe70f815b1