| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 20 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-bdb8a84e417625979f8631c1 |
| Net Summer Capacity (MW) | 20 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-bdb8a84e417625979f8631c1 |
| Net Winter Capacity (MW) | 20 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-bdb8a84e417625979f8631c1 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 67449 |
| Entity Name | East Point Energy, LLC |
| Plant ID | 70233 |
| Plant Name | Railroad Energy Center, LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | VA |
| County | Prince William |
| Balancing Authority Code | PJM |
| Sector | IPP Non-CHP |
| Generator ID | RAILR |
| Nameplate Capacity (MW) | 20 |
| Net Summer Capacity (MW) | 20 |
| Net Winter Capacity (MW) | 20 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 10 |
| Planned Operation Year | 2026 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 38.781689 |
| Longitude | -77.54202 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:308 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2686
Sources EV-bca1ac4cc9dd8f12e33d29fcEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 fdef7259aa43452ca8a2b29ec4e92c78b97f3657ba616906063a8d190003c558
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:308
Sources EV-bdb8a84e417625979f8631c1Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c87e4f541185c2a357d02058500b01134d663f8582cac3e75b91d5317d3c5afb
Usage terms US government public domain