Railroad Energy Center, LLC / RAILR

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)20 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-bdb8a84e417625979f8631c1
Net Summer Capacity (MW)20 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-bdb8a84e417625979f8631c1
Net Winter Capacity (MW)20 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-bdb8a84e417625979f8631c1
Detailed source fields
Original source fieldPublished value or condition
Entity ID67449
Entity NameEast Point Energy, LLC
Plant ID70233
Plant NameRailroad Energy Center, LLC
Google MapMap
Bing MapMap
Plant StateVA
CountyPrince William
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDRAILR
Nameplate Capacity (MW)20
Net Summer Capacity (MW)20
Net Winter Capacity (MW)20
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month10
Planned Operation Year2026
Status(U) Under construction, less than or equal to 50 percent complete
Latitude38.781689
Longitude-77.54202
Original text(U) Under construction, less than or equal to 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:308

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2686

Sources EV-bca1ac4cc9dd8f12e33d29fc
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 fdef7259aa43452ca8a2b29ec4e92c78b97f3657ba616906063a8d190003c558

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:308

Sources EV-bdb8a84e417625979f8631c1
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c87e4f541185c2a357d02058500b01134d663f8582cac3e75b91d5317d3c5afb

Usage terms US government public domain

Source snapshots by date · USA · eia860

Railroad Energy Center, LLC / RAILR

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID67449
Utility NameEast Point Energy, LLC
Plant Code70233
Plant NameRailroad Energy Center, LLC
StateVA
CountyPrince William
Generator IDRAILR
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
RTO/ISO LMP Node DesignationRAILRDDP230 KV NOVECLD1
RTO/ISO Location Designation for Reporting Wholesale Sales Data to FERCRAILRDDP230 KV NOVECLD1
Nameplate Capacity (MW)20
Summer Capacity (MW)20
Winter Capacity (MW)20
StatusU
Effective Month10
Effective Year2026
Current Month10
Current Year2026
Sector NameIPP Non-CHP
Sector2
Previously CanceledN
Energy Source 1MWH
Original textU
source_record_id3_1_Generator_Y2025.xlsx#Proposed:2686

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2686

Sources EV-bca1ac4cc9dd8f12e33d29fc
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 fdef7259aa43452ca8a2b29ec4e92c78b97f3657ba616906063a8d190003c558

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Railroad Energy Center, LLC / RAILR

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID67449
Entity NameEast Point Energy, LLC
Plant ID70233
Plant NameRailroad Energy Center, LLC
Google MapMap
Bing MapMap
Plant StateVA
CountyPrince William
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator IDRAILR
Nameplate Capacity (MW)20
Net Summer Capacity (MW)20
Net Winter Capacity (MW)20
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month10
Planned Operation Year2026
Status(U) Under construction, less than or equal to 50 percent complete
Latitude38.781689
Longitude-77.54202
Original text(U) Under construction, less than or equal to 50 percent complete
source_record_idPlanned:308

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:308

Sources EV-bdb8a84e417625979f8631c1
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c87e4f541185c2a357d02058500b01134d663f8582cac3e75b91d5317d3c5afb

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel