United States of America · Generator · plant location

Lonesome Camp Solar Plant / LCSP1

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Duke Energy Florida, LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
28.079121, -81.24029

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Lonesome Camp Solar Plant / LCSP1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)74.9 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-1c2fd7f53778bf2ca09fe1d7
Net Summer Capacity (MW)74.9 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-1c2fd7f53778bf2ca09fe1d7
Net Winter Capacity (MW)74.9 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-1c2fd7f53778bf2ca09fe1d7
Detailed source fields
Original source fieldPublished value or condition
Entity ID6455
Entity NameDuke Energy Florida, LLC
Plant ID70222
Plant NameLonesome Camp Solar Plant
Google MapMap
Bing MapMap
Plant StateFL
CountyOsceola
Balancing Authority CodeFPC
SectorElectric Utility
Generator IDLCSP1
Nameplate Capacity (MW)74.9
Net Summer Capacity (MW)74.9
Net Winter Capacity (MW)74.9
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month4
Planned Operation Year2027
Status(V) Under construction, more than 50 percent complete
Latitude28.079121
Longitude-81.24029
Original text(V) Under construction, more than 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:788

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2676

Sources EV-0b6271b59075ff135529b9d3
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ac90d54254687559f4ad3048b94ba86f4dee46931fb88220fa6471ba17f7cb18

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:788

Sources EV-1c2fd7f53778bf2ca09fe1d7
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 86245c8af589e4949df0985dc18b89316b28334c63d347a090e33ca8687ab766

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel