Lonesome Camp Solar Plant / LCSP1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 74.9 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-1c2fd7f53778bf2ca09fe1d7 |
| Net Summer Capacity (MW) | 74.9 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-1c2fd7f53778bf2ca09fe1d7 |
| Net Winter Capacity (MW) | 74.9 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-1c2fd7f53778bf2ca09fe1d7 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 6455 |
| Entity Name | Duke Energy Florida, LLC |
| Plant ID | 70222 |
| Plant Name | Lonesome Camp Solar Plant |
| Google Map | Map |
| Bing Map | Map |
| Plant State | FL |
| County | Osceola |
| Balancing Authority Code | FPC |
| Sector | Electric Utility |
| Generator ID | LCSP1 |
| Nameplate Capacity (MW) | 74.9 |
| Net Summer Capacity (MW) | 74.9 |
| Net Winter Capacity (MW) | 74.9 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 4 |
| Planned Operation Year | 2027 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 28.079121 |
| Longitude | -81.24029 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:788 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2676
Sources EV-0b6271b59075ff135529b9d3Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ac90d54254687559f4ad3048b94ba86f4dee46931fb88220fa6471ba17f7cb18
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:788
Sources EV-1c2fd7f53778bf2ca09fe1d7Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 86245c8af589e4949df0985dc18b89316b28334c63d347a090e33ca8687ab766
Usage terms US government public domain