Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
Lonesome Camp Solar Plant / LCSP1
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
74.9 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-1c2fd7f53778bf2ca09fe1d7
Net Summer Capacity (MW)
74.9 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-1c2fd7f53778bf2ca09fe1d7
Net Winter Capacity (MW)
74.9 MW
Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-1c2fd7f53778bf2ca09fe1d7
Detailed source fields
Original source field
Published value or condition
Entity ID
6455
Entity Name
Duke Energy Florida, LLC
Plant ID
70222
Plant Name
Lonesome Camp Solar Plant
Google Map
Map
Bing Map
Map
Plant State
FL
County
Osceola
Balancing Authority Code
FPC
Sector
Electric Utility
Generator ID
LCSP1
Nameplate Capacity (MW)
74.9
Net Summer Capacity (MW)
74.9
Net Winter Capacity (MW)
74.9
Technology
Solar Photovoltaic
Energy Source Code
SUN
Prime Mover Code
PV
Planned Operation Month
4
Planned Operation Year
2027
Status
(V) Under construction, more than 50 percent complete
Latitude
28.079121
Longitude
-81.24029
Original text
(V) Under construction, more than 50 percent complete