Sherco BESS / SSB
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 300 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-9ad86a0d14266f69043889ce |
| Net Summer Capacity (MW) | 300 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-9ad86a0d14266f69043889ce |
| Net Winter Capacity (MW) | 300 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-9ad86a0d14266f69043889ce |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13781 |
| Entity Name | Northern States Power Co - Minnesota |
| Plant ID | 70097 |
| Plant Name | Sherco BESS |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MN |
| County | Sherburne |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | SSB |
| Nameplate Capacity (MW) | 300 |
| Net Summer Capacity (MW) | 300 |
| Net Winter Capacity (MW) | 300 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 12 |
| Planned Operation Year | 2027 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 45.372125 |
| Longitude | -93.89978 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1390 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:2597
Sources EV-987b3e4205bf1cfa14c2b4a6Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d6b642158d23b4d3ca87b12b542e9b2bbcb35bff8e8576914e66e62f0e3b82b6
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1390
Sources EV-9ad86a0d14266f69043889ceEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8d89a40d1f3089e368b8fe5b469fd0f2bfa4490b60955e15375acb179d717ab6
Usage terms US government public domain