Power assets and projects · USA · eia860m

Sherco BESS / SSB

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)300 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-9ad86a0d14266f69043889ce
Net Summer Capacity (MW)300 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-9ad86a0d14266f69043889ce
Net Winter Capacity (MW)300 MWOriginal source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete
As-of date 2026-08
Sources EV-9ad86a0d14266f69043889ce
Detailed source fields
Original source fieldPublished value or condition
Entity ID13781
Entity NameNorthern States Power Co - Minnesota
Plant ID70097
Plant NameSherco BESS
Google MapMap
Bing MapMap
Plant StateMN
CountySherburne
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDSSB
Nameplate Capacity (MW)300
Net Summer Capacity (MW)300
Net Winter Capacity (MW)300
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month12
Planned Operation Year2027
Status(U) Under construction, less than or equal to 50 percent complete
Latitude45.372125
Longitude-93.89978
Original text(U) Under construction, less than or equal to 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1390

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2597

Sources EV-987b3e4205bf1cfa14c2b4a6
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d6b642158d23b4d3ca87b12b542e9b2bbcb35bff8e8576914e66e62f0e3b82b6

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1390

Sources EV-9ad86a0d14266f69043889ce
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8d89a40d1f3089e368b8fe5b469fd0f2bfa4490b60955e15375acb179d717ab6

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Sherco BESS / SSB

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID13781
Entity NameNorthern States Power Co - Minnesota
Plant ID70097
Plant NameSherco BESS
Google MapMap
Bing MapMap
Plant StateMN
CountySherburne
Balancing Authority CodeMISO
SectorElectric Utility
Generator IDSSB
Nameplate Capacity (MW)300
Net Summer Capacity (MW)300
Net Winter Capacity (MW)300
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month12
Planned Operation Year2027
Status(U) Under construction, less than or equal to 50 percent complete
Latitude45.372125
Longitude-93.89978
Original text(U) Under construction, less than or equal to 50 percent complete
source_record_idPlanned:1390

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1390

Sources EV-9ad86a0d14266f69043889ce
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8d89a40d1f3089e368b8fe5b469fd0f2bfa4490b60955e15375acb179d717ab6

Usage terms US government public domain

Source snapshots by date · USA · eia860

Sherco BESS / SSB

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID13781
Utility NameNorthern States Power Co - Minnesota
Plant Code70097
Plant NameSherco BESS
StateMN
CountySherburne
Generator IDSSB
TechnologyBatteries
Prime MoverBA
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)300
Summer Capacity (MW)300
Winter Capacity (MW)300
StatusU
Effective Month12
Effective Year2027
Current Month12
Current Year2027
Associated with Combined Heat and Power SystemN
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1MWH
Original textU
source_record_id3_1_Generator_Y2025.xlsx#Proposed:2597

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2597

Sources EV-987b3e4205bf1cfa14c2b4a6
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d6b642158d23b4d3ca87b12b542e9b2bbcb35bff8e8576914e66e62f0e3b82b6

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel