United States of America · Generator · plant location

Tanglewood BESS / BAT1

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
North Carolina El Member Corp
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
36.272111, -76.30127

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Tanglewood BESS / BAT1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)3.9 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-02e3b82f1ee79bf990c8dabb
Net Summer Capacity (MW)3.9 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-02e3b82f1ee79bf990c8dabb
Net Winter Capacity (MW)3.9 MWOriginal source column definition · Generator · (V) Under construction, more than 50 percent complete
As-of date 2026-08
Sources EV-02e3b82f1ee79bf990c8dabb
Detailed source fields
Original source fieldPublished value or condition
Entity ID13683
Entity NameNorth Carolina El Member Corp
Plant ID69871
Plant NameTanglewood BESS
Google MapMap
Bing MapMap
Plant StateNC
CountyPasquotank
Balancing Authority CodePJM
SectorElectric Utility
Generator IDBAT1
Nameplate Capacity (MW)3.9
Net Summer Capacity (MW)3.9
Net Winter Capacity (MW)3.9
TechnologyBatteries
Energy Source CodeMWH
Prime Mover CodeBA
Planned Operation Month12
Planned Operation Year2026
Status(V) Under construction, more than 50 percent complete
Latitude36.272111
Longitude-76.30127
Original text(V) Under construction, more than 50 percent complete
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:562

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2424

Sources EV-90ac6efe981ae03869583c64
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 dd0342f613d4cd8edbadc13bbd67898c3a0c78580f447e2bdc5f9fe483c67006

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:562

Sources EV-02e3b82f1ee79bf990c8dabb
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b3b4739082989cf15bb497fccbd3e6e5d579819b65d2939c8e9ed1d5ae09f1d1

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel