United States of America · Generator · plant location

Mohave Energy Park / GT1

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Arizona Electric Pwr Coop Inc
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
34.932499, -114.548

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Mohave Energy Park / GT1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)60.5 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-b113959f7f20ec1bf85f8839
Net Summer Capacity (MW)43 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-b113959f7f20ec1bf85f8839
Net Winter Capacity (MW)43 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-b113959f7f20ec1bf85f8839
Detailed source fields
Original source fieldPublished value or condition
Entity ID796
Entity NameArizona Electric Pwr Coop Inc
Plant ID69773
Plant NameMohave Energy Park
Google MapMap
Bing MapMap
Plant StateAZ
CountyMohave
Balancing Authority CodeWALC
SectorElectric Utility
Generator IDGT1
Nameplate Capacity (MW)60.5
Net Summer Capacity (MW)43
Net Winter Capacity (MW)43
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Planned Operation Month12
Planned Operation Year2027
Status(L) Regulatory approvals pending. Not under construction
Latitude34.932499
Longitude-114.548
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1362

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2156

Sources EV-026cfc4e222985c1be625c11
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 895b32d0e757d52a646841bbdc97c4b7c557b6d4319c662dd8bc6f5e99610327

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1362

Sources EV-b113959f7f20ec1bf85f8839
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6f1230bbe3fac015b52d83d0f460b95ae99e748bfe62f6708848ee5bd5e108bf

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel