Power assets and projects · USA · eia860m

Mohave Energy Park / GT1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)60.5 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-b113959f7f20ec1bf85f8839
Net Summer Capacity (MW)43 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-b113959f7f20ec1bf85f8839
Net Winter Capacity (MW)43 MWOriginal source column definition · Generator · (L) Regulatory approvals pending. Not under construction
As-of date 2026-08
Sources EV-b113959f7f20ec1bf85f8839
Detailed source fields
Original source fieldPublished value or condition
Entity ID796
Entity NameArizona Electric Pwr Coop Inc
Plant ID69773
Plant NameMohave Energy Park
Google MapMap
Bing MapMap
Plant StateAZ
CountyMohave
Balancing Authority CodeWALC
SectorElectric Utility
Generator IDGT1
Nameplate Capacity (MW)60.5
Net Summer Capacity (MW)43
Net Winter Capacity (MW)43
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Planned Operation Month12
Planned Operation Year2027
Status(L) Regulatory approvals pending. Not under construction
Latitude34.932499
Longitude-114.548
Original text(L) Regulatory approvals pending. Not under construction
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1362

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2156

Sources EV-026cfc4e222985c1be625c11
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 895b32d0e757d52a646841bbdc97c4b7c557b6d4319c662dd8bc6f5e99610327

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1362

Sources EV-b113959f7f20ec1bf85f8839
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6f1230bbe3fac015b52d83d0f460b95ae99e748bfe62f6708848ee5bd5e108bf

Usage terms US government public domain

Source snapshots by date · USA · eia860m

Mohave Energy Park / GT1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Entity ID796
Entity NameArizona Electric Pwr Coop Inc
Plant ID69773
Plant NameMohave Energy Park
Google MapMap
Bing MapMap
Plant StateAZ
CountyMohave
Balancing Authority CodeWALC
SectorElectric Utility
Generator IDGT1
Nameplate Capacity (MW)60.5
Net Summer Capacity (MW)43
Net Winter Capacity (MW)43
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Planned Operation Month12
Planned Operation Year2027
Status(L) Regulatory approvals pending. Not under construction
Latitude34.932499
Longitude-114.548
Original text(L) Regulatory approvals pending. Not under construction
source_record_idPlanned:1362

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1362

Sources EV-b113959f7f20ec1bf85f8839
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6f1230bbe3fac015b52d83d0f460b95ae99e748bfe62f6708848ee5bd5e108bf

Usage terms US government public domain

Source snapshots by date · USA · eia860

Mohave Energy Park / GT1

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Utility ID796
Utility NameArizona Electric Pwr Coop Inc
Plant Code69773
Plant NameMohave Energy Park
StateAZ
CountyMohave
Generator IDGT1
TechnologyNatural Gas Fired Combustion Turbine
Prime MoverGT
OwnershipS
Duct BurnersX
Can Bypass Heat Recovery Steam Generator?X
Nameplate Capacity (MW)60.5
Nameplate Power Factor0.85
Summer Capacity (MW)43
Winter Capacity (MW)43
StatusL
Effective Month6
Effective Year2027
Current Month12
Current Year2027
Sector NameElectric Utility
Sector1
Previously CanceledN
Energy Source 1NG
Multiple Fuels?N
Original textL
source_record_id3_1_Generator_Y2025.xlsx#Proposed:2156

Parent facility or plant record

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:2156

Sources EV-026cfc4e222985c1be625c11
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 895b32d0e757d52a646841bbdc97c4b7c557b6d4319c662dd8bc6f5e99610327

Usage terms US government public domain

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel