United States of America · Generator · plant location

Sinnissippi Solar Energy LLC / SNSPI

공식 원천의 전력 객체 · Plan

Project stage · source basis
Planned / preconstruction · planned
Reported operator
Invenergy Services LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
43.12592, -88.67098

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Sinnissippi Solar Energy LLC / SNSPI

Generator · Plan

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)100 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-0a0e49e5d96052a3126568dc
Net Summer Capacity (MW)100 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-0a0e49e5d96052a3126568dc
Net Winter Capacity (MW)100 MWOriginal source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated
As-of date 2026-08
Sources EV-0a0e49e5d96052a3126568dc
Detailed source fields
Original source fieldPublished value or condition
Entity ID49893
Entity NameInvenergy Services LLC
Plant ID69608
Plant NameSinnissippi Solar Energy LLC
Google MapMap
Bing MapMap
Plant StateWI
CountyJefferson
Balancing Authority CodeMISO
SectorIPP Non-CHP
Generator IDSNSPI
Nameplate Capacity (MW)100
Net Summer Capacity (MW)100
Net Winter Capacity (MW)100
TechnologySolar Photovoltaic
Energy Source CodeSUN
Prime Mover CodePV
Planned Operation Month12
Planned Operation Year2028
Status(P) Planned for installation, but regulatory approvals not initiated
Latitude43.12592
Longitude-88.67098
Original text(P) Planned for installation, but regulatory approvals not initiated
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idPlanned:1811

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Proposed:1980

Sources EV-e0252735dab8042cc0c331d5
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6a963e4421329229d85a5fbb424746b9bc001d6663243a0d208471abdfc035fa

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Planned:1811

Sources EV-0a0e49e5d96052a3126568dc
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c36b981e834a91e847f3cbf4db7fb7d8152fd4ff3e62a42d1de58be624862183

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel