Sinnissippi Solar Energy LLC / SNSPI
발전기 · 계획
| 지표·조건 | 출처 값 | 기준·범위·단계 |
|---|---|---|
| Nameplate Capacity (MW) | 100 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-0a0e49e5d96052a3126568dc |
| Net Summer Capacity (MW) | 100 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-0a0e49e5d96052a3126568dc |
| Net Winter Capacity (MW) | 100 MW | 원출처 열 정의 · 발전기 · (P) Planned for installation, but regulatory approvals not initiated 기준일 2026-08 근거 EV-0a0e49e5d96052a3126568dc |
원출처 세부 필드
| 원출처 항목 | 공개값·조건 |
|---|---|
| Entity ID | 49893 |
| Entity Name | Invenergy Services LLC |
| Plant ID | 69608 |
| Plant Name | Sinnissippi Solar Energy LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | WI |
| County | Jefferson |
| Balancing Authority Code | MISO |
| Sector | IPP Non-CHP |
| Generator ID | SNSPI |
| Nameplate Capacity (MW) | 100 |
| Net Summer Capacity (MW) | 100 |
| Net Winter Capacity (MW) | 100 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Planned Operation Month | 12 |
| Planned Operation Year | 2028 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 43.12592 |
| Longitude | -88.67098 |
| 원문 상태 | (P) Planned for installation, but regulatory approvals not initiated |
| 좌표 정확도 | source_precision_not_independently_surveyed |
| source_record_id | Planned:1811 |
Coordinates locate the plant, including when this record describes one generator.
위치: 발전소 위치 · 발전기 개별 위치 아님
원문·기준일·확인일 2건
자료 기준 2025 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 3_1_Generator_Y2025.xlsx#Proposed:1980
근거 EV-e0252735dab8042cc0c331d5자료 SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6a963e4421329229d85a5fbb424746b9bc001d6663243a0d208471abdfc035fa
자료 기준 2026-08 · 수집 확인 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
원문 위치 Planned:1811
근거 EV-0a0e49e5d96052a3126568dc자료 SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c36b981e834a91e847f3cbf4db7fb7d8152fd4ff3e62a42d1de58be624862183
