Waterford 6 / ST1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 342 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-d8ac189e7d227e8d05b137e0 |
| Net Summer Capacity (MW) | 310 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-d8ac189e7d227e8d05b137e0 |
| Net Winter Capacity (MW) | 315 MW | Original source column definition · Generator · (P) Planned for installation, but regulatory approvals not initiated As-of date 2026-08 Sources EV-d8ac189e7d227e8d05b137e0 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 11241 |
| Entity Name | Entergy Louisiana LLC |
| Plant ID | 69445 |
| Plant Name | Waterford 6 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | LA |
| County | St Charles |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | ST1 |
| Unit Code | WF6 |
| Nameplate Capacity (MW) | 342 |
| Net Summer Capacity (MW) | 310 |
| Net Winter Capacity (MW) | 315 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CA |
| Planned Operation Month | 6 |
| Planned Operation Year | 2030 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 29.988583 |
| Longitude | -90.48565 |
| Original text | (P) Planned for installation, but regulatory approvals not initiated |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:2071 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1863
Sources EV-7834d8a4ec9a0eb560c32d35Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 bedeb9c8b0a559f80d6783481877d9176b673fbd07e41ec5cd46a901690ae9ac
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:2071
Sources EV-d8ac189e7d227e8d05b137e0Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6178ffff448824b1d9da50098bbd1789bd22cc2d348acdd43cd83253fac78fd0
Usage terms US government public domain