Waterford 6 / ST1
发电机 · 计划
| 指标或条件 | 原文数值 | 口径、范围及阶段 |
|---|---|---|
| Nameplate Capacity (MW) | 342 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-d8ac189e7d227e8d05b137e0 |
| Net Summer Capacity (MW) | 310 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-d8ac189e7d227e8d05b137e0 |
| Net Winter Capacity (MW) | 315 MW | 原始来源列定义 · 发电机 · (P) Planned for installation, but regulatory approvals not initiated 基准日期 2026-08 依据 EV-d8ac189e7d227e8d05b137e0 |
原始来源详细字段
| 原始来源字段 | 公开数值或条件 |
|---|---|
| Entity ID | 11241 |
| Entity Name | Entergy Louisiana LLC |
| Plant ID | 69445 |
| Plant Name | Waterford 6 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | LA |
| County | St Charles |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | ST1 |
| Unit Code | WF6 |
| Nameplate Capacity (MW) | 342 |
| Net Summer Capacity (MW) | 310 |
| Net Winter Capacity (MW) | 315 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CA |
| Planned Operation Month | 6 |
| Planned Operation Year | 2030 |
| Status | (P) Planned for installation, but regulatory approvals not initiated |
| Latitude | 29.988583 |
| Longitude | -90.48565 |
| 原文状态 | (P) Planned for installation, but regulatory approvals not initiated |
| 坐标精度 | source_precision_not_independently_surveyed |
| source_record_id | Planned:2071 |
Coordinates locate the plant, including when this record describes one generator.
位置: 电厂位置 · 非单台发电机位置
原文、基准日期与核实日期 2条
数据来源 2025 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
原文位置 3_1_Generator_Y2025.xlsx#Proposed:1863
依据 EV-7834d8a4ec9a0eb560c32d35资料SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 bedeb9c8b0a559f80d6783481877d9176b673fbd07e41ec5cd46a901690ae9ac
数据来源 2026-08 · 收集核实 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.