Asheville BESS / AVLB1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 17.3 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-883c90e1098d2337a122f3cd |
| Net Summer Capacity (MW) | 17.3 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-883c90e1098d2337a122f3cd |
| Net Winter Capacity (MW) | 17.3 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-883c90e1098d2337a122f3cd |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 3046 |
| Entity Name | Duke Energy Progress - (NC) |
| Plant ID | 69429 |
| Plant Name | Asheville BESS |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NC |
| County | Buncombe |
| Balancing Authority Code | CPLW |
| Sector | Electric Utility |
| Generator ID | AVLB1 |
| Nameplate Capacity (MW) | 17.3 |
| Net Summer Capacity (MW) | 17.3 |
| Net Winter Capacity (MW) | 17.3 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 9 |
| Planned Operation Year | 2026 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 35.472139 |
| Longitude | -82.54163 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:123 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1855
Sources EV-2d5d7ebe2592235419aff558Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 d36648e880c01d0360bdc21207f76902a77d173dcf8eb95b01a61af2fe9b6033
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:123
Sources EV-883c90e1098d2337a122f3cdEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ec8614ba5b12f9ccaea7837a6acb980e197951f76900d5a06e6c2754d79cddc6
Usage terms US government public domain
