BESS TX Camarine - BSHOU001 / BSOU1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 9.9 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-f0fff6cd2462e52bed291376 |
| Net Summer Capacity (MW) | 9.9 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-f0fff6cd2462e52bed291376 |
| Net Winter Capacity (MW) | 9.9 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-f0fff6cd2462e52bed291376 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 67035 |
| Entity Name | Prologis Logistics Services Incorporated BESS |
| Plant ID | 69246 |
| Plant Name | BESS TX Camarine - BSHOU001 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | TX |
| County | Harris |
| Balancing Authority Code | ERCO |
| Sector | IPP Non-CHP |
| Generator ID | BSOU1 |
| Nameplate Capacity (MW) | 9.9 |
| Net Summer Capacity (MW) | 9.9 |
| Net Winter Capacity (MW) | 9.9 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 11 |
| Planned Operation Year | 2026 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 29.86648 |
| Longitude | -95.43066 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:381 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1742
Sources EV-49822e0e1e097fc221cc90fcEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ede2e62a96eae753578707b51346f9a6e76e23c79b0d94fb704ab74e16680b2a
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:381
Sources EV-f0fff6cd2462e52bed291376Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ffd1f67d3e8b3f10af37ddd62dcd70df39e8d103a277832c3a10bbf858ac5dc9
Usage terms US government public domain