Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 3items · current page 1–3 · Source records, not unique facilities.
Power assets and projects · USA · eia860m
BESS TX Camarine - BSHOU001 / BSOU1
Generator · Plan
Metric or condition
Source value
Basis, scope and stage
Nameplate Capacity (MW)
9.9 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-f0fff6cd2462e52bed291376
Net Summer Capacity (MW)
9.9 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-f0fff6cd2462e52bed291376
Net Winter Capacity (MW)
9.9 MW
Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-f0fff6cd2462e52bed291376
Detailed source fields
Original source field
Published value or condition
Entity ID
67035
Entity Name
Prologis Logistics Services Incorporated BESS
Plant ID
69246
Plant Name
BESS TX Camarine - BSHOU001
Google Map
Map
Bing Map
Map
Plant State
TX
County
Harris
Balancing Authority Code
ERCO
Sector
IPP Non-CHP
Generator ID
BSOU1
Nameplate Capacity (MW)
9.9
Net Summer Capacity (MW)
9.9
Net Winter Capacity (MW)
9.9
Technology
Batteries
Energy Source Code
MWH
Prime Mover Code
BA
Planned Operation Month
11
Planned Operation Year
2026
Status
(U) Under construction, less than or equal to 50 percent complete
Latitude
29.86648
Longitude
-95.43066
Original text
(U) Under construction, less than or equal to 50 percent complete