New Hill 1 Battery / NHBA1
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 56 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-1d13f2d2043d72b9b4564132 |
| Net Summer Capacity (MW) | 56 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-1d13f2d2043d72b9b4564132 |
| Net Winter Capacity (MW) | 56 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-1d13f2d2043d72b9b4564132 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 3046 |
| Entity Name | Duke Energy Progress - (NC) |
| Plant ID | 69119 |
| Plant Name | New Hill 1 Battery |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NC |
| County | Wake |
| Balancing Authority Code | CPLE |
| Sector | Electric Utility |
| Generator ID | NHBA1 |
| Nameplate Capacity (MW) | 56 |
| Net Summer Capacity (MW) | 56 |
| Net Winter Capacity (MW) | 56 |
| Technology | Batteries |
| Energy Source Code | MWH |
| Prime Mover Code | BA |
| Planned Operation Month | 9 |
| Planned Operation Year | 2027 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 35.659692 |
| Longitude | -78.94412 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1024 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:1661
Sources EV-891d1be4550e6ea20227fc8eEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a3143e7b8f9853faed72918a1b8666868462b1e44ce3fcc7489166bbb3de1d38
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1024
Sources EV-1d13f2d2043d72b9b4564132Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 204198026d2231df8b562d2b59373c1959a78f793bd3dbf9a640c723d7114871
Usage terms US government public domain